Consultancy Projects
| Sl. no. | Name of the faculty | Consultancy Project | Funding agency | Duration | Year of commencement | Completed/ ongoing | SPECIALISATION |
| 1 | DR. S.Dutta | ISIF Asia 2021 | APNICFoundation | 2021 | ongoing | STRUCTURAL/EQ | |
| 2 | Prof. A.K Dey | Soil testng for determination of suitable foundations | CPWD,Silchar | 6 months | 2019 | Completed | Geotechnical Engg |
| Causes and remedial measures for sinking of Silchar bypass road | PWD,Assam | 6 months | 2019 | Completed | |||
| Testing of building materials | KMV Projects ltd , Aizawl | 6 months | 2021 | Completed | |||
| Investigation of tilting of boundary wall | LICI,Silchar HO , Meherpur | 6 months | 2021 | Completed | |||
| Soil Testing report | GREF | 3 months | 2021 | Completed | |||
| Mix Design | RIPANS,Aizawl | 3 months | 2021 | Completed | |||
| Liquefaction Analysis | Starlite Power Transmission limited , Silvassa , India | 6 months | 2021 | completed | |||
| 3 | Dr. A. Kuity | Coarse Aggregate | Shiv Build India Pvt. Ltd. Kumarghat, Tripura | 1 Month | 2021 | Completed | Transportation |
| Bituminous Mix design for BC, Bitumen, CA | Shiv Build India Pvt. Ltd. Kumarghat, Tripura | 1 Month | 2021 | Completed | |||
| Bituminous Mix | Shiv Build India Pvt. Ltd. Kumarghat, Tripura | 1 Month | 2021 | Completed | |||
| Soil, Bitumen testing | Shiv Build India Pvt. Ltd. Kumarghat, Tripura | 3 Months | 2021 | Completed | |||
| Bitumen | International Consultants and Technocrats Pvt. Ltd. | 1 Month | 2021 | Completed | |||
| 4 | Dr. K. L. Singh | Improvement / Widening to 2 laning of strecth from Khongsang to Tamenglong of NH-137 | Shivalaya Construction Pvt. Ltd. | 3 Months | 2021 | Completed | Transportation |
| 5 | Prof. M. A. Ahmed | Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana | NRRDA-PMGSY | 1 Months | 2021 | Completed | Transportation |
| Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana | NRRDA-PMGSY | 1 Months | 2021 | Completed | |||
| Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana | NRRDA-PMGSY | 1 Months | 2019 | Completed | |||
| 6 | Pallab Das | Vetting of structural Drawings | MGCC Ltd , Shillong | 6 months | 2021 | Completed | STRUCTURAL/EQ |
| MIx Design | Shaare Project Ltd | 2018 | Completed | ||||
| NEEPCO Ltd. | N.D.T Test | 2018 | Completed | ||||
| S.L.T Infracon | MIx Design | 2018 | Completed | ||||
| M.S.V Infrastructure | Material Testing | 2018 | Completed | ||||
| B.S Construction Ltd | Pile load Test | 2018 | Completed | ||||
| 7 | Dr.Tauhidur Rahman | Proof Checking | PWD Govt of Assam | 2 months | 2019 | Completed | STRUCTURAL/EQ |
| 8 | Prof. A.I Laskar | Proof Checking | BIPL-BVEPL | 2018 | Completed | STRUCTURAL/EQ | |
| Proof Checking | NEER NIRMAL PARIYOJNA, ASSAM | 2018 | Completed | ||||
| MIX DESIGN | GAUTAM CONSTRUCTION | 2018 | Completed | ||||
| 9 | Dr. A.K Das | Preparation of Geotechnical report for construction of proposed commercial complex | FRONTEK Sales Pvt Ltd | 3 months | 2021 | Completed | Geotechnical Engg |
| 10 | Prof. A.K. Barbhuiya | Pile Load Test | NCC limited | 2020 | Completed | Water ResourcesEngg | |
| Soil Investigation | Taj Uddin Latimara. Katigorah | 2021 | Completed | Water ResourcesEngg | |||
| Dr BS Sil | Technical guidance in Silchar-Kalain Road | Silchar W R Division | 2018 | Completed | Water Resources Engg | ||
| 11 | Prof U Kumar | Water | AE, SCSD-II CPWD, Silchar | 2021 | Completed | Environmental Engg | |
| Boulder, Soil | AE-TEAM Leader Rodic Consultants Pvt. Ltd. in JV with TPF | 2021 | completed | Environmental Engg | |||
| 12 | Dr Kulkarni V V | Random Verification Of Annual Inventory Report On Hazardous Waste Management | Central Pollution Control Board, New Delhi | 6 months | 2021 | ongoing | Environmental Engg |